MAIN SECTIONS >  Home  Gloucester Docks  Sharpness Docks  G&S Canal  Vessels  People  Studies
REGENERATION PAGES >  Overview  Main Docks Area  Gloucester Quays  Monk Meadow Quay

Gloucester Docks &
the Sharpness Canal

 

Barge Arm Apartments


This page features the two blocks of apartments built around the Barge Arm in 2005-06, and the following links lead to pages that feature other developments in the docks:

Residential Warehouses  West Quay Apartments  Public Realm  Kimbrose Walk  Merchants Quay
 

Planned apartments around the Barge Arm at Gloucester DocksPlans
     A five-storey block on the north side of the Barge Arm (seen left in the picture) was designed to provide 67 one and two-bedroom apartments with two retail units on the ground floor. A long building to the east of the Barge Arm (seen right in the picture) was designed to have 17 apartments and four commercial units with a 256-space four-level car park behind. The designs by Edward Cullinan Architects specified the use of natural, sustainably resourced materials and energy-saving technology, including water-conserving plumbing, effective insulation and home-working facilities. The plans were approved by Gloucester city planning committee on 5 Oct 2004.

ProgressDrilling for piles for the Barge Arm apartments at Gloucester Docks


Main contractors Cowlin Construction started preparing the site to the north of the Barge Arm in December 2004 and soon uncovered some stone sleeper blocks of an 1820s horse operated tramroad. Meanwhile demolition contractors L A Moore started taking down the former Gloucester Sack Works building to the east of the Barge Arm.


Dismantling the former sack works at Gloucester Docks

Apartments to the north of the Barge Arm Jun 2005

Multi-storey Car Park Jun 2005

By early June 2005, the structure of the ground and first floors of the apartments to the north of the Barge Arm were complete, and work was well advanced on the multi-storey car park to the east of the Barge Arm. 

The apartments and multi-storey car park to the east of the Barge Arm were completed in August 2006, and the apartments to the north of the Barge Arm were finished in October 2006.

 Return to Top Menu   Copyright Hugh Conway-Jones 2004-06   Contact